June 25, 2012

Eastern Divide 50k Race Report

"How'd you do?" I've heard that question many times in the past few days from friends on facebook as well as those standing face-to-face. There are always quantifiable dimensions of a race like a 50 kilometer; one's time and place and the number of aching muscles. But there are also answers to "How'd you do?" that take a bit more time to think through: I recall wanting to vomit at one part; my quads nearly rebelled at mile 25; and I really, really wanted to bail at mile 29.5 when I could smell BBQ as the course ran within 100 yards of the grill at the finish line (who thought that was a good idea?!?) Asking "How'd you do?" is more akin to saying "How was last month?" or "How did the semester go?" than "How was your day at work, honey?" Even though a 50k only takes up a few hours over the course of a single day, the range of physical and emotional sensations one goes through can vary tremendously over 31 mountainous miles. 

Pre-race dinner near the finish, at beautiful Mountain Lake Virginia


By quantitative measures, I did really well in the Eastern Divide 50k. I ran my best 50k by over 15 minutes (5 hr 9 min) and placed 16th overall out of 180 starters. I was also able to run the race with much, much less training when compared to other 50ks I've done. Overall, the course was very generous--lots of fire roads, very little circuitious single track, and a length just a touch shorter than 50 kilometers. All of this helped shorten race times. Volunteers at the aid stations were awesome and my family (especially my daughter) were waiting about 1.5 miles from the finish to give me a final and very necessary push to the end!

A few things went awry as well, which is too be expected. One rule I always try to keep in mind is that a 50k is not equal to a marathon plus 5 miles. While the equation "50k = marthon + 5 miles" is technically correct, you're out on your feet nearly twice as long as a road marathon. You climb-and-descend vertical miles in addition to the horizontal ones you run. And you're on your own in the woods for long, long stretches rather than surrounded by people in a city, like most marathons.

When doing final preparations the night before the race I realized that I had left my fizzy electrolyte tablets back home. This usually isn't a big deal except that I have a strong aversion to Heed, the power drink at all the aid stations for this course. After my first gulp of the stuff at mile 4 I had a queasy stomach for the next 18 miles. While my minimal training strategy was great in some respects (it really wasn't a strategy at all--I just didn't make enough time to train for this race), but I definitely hadn't run enough hills. After finishing almost all of the course's front-loaded uphill by mile 18, I found that I couldn't run up even the smallest hills. My inner-most quad--the vastus medialis I think--tightened into a ball (the only time I've ever been aware of these muscles is when running the Mt Disappointment 50k, which includes a 2000' climb in the final 3 miles!) I was forced to walk sections of supremely runnable forest roads. Attempts to convince myself that slight-uphills were actually slight-downhills-plus-visual-perspective failed multiple times. The mind might be willing, but the body is not so easily fooled.

One big boost for me was at mile 22. I was on a long forest road between aid stations. Reduced to walking tiny uphills. Sick of Heed. Thinking I was only at 19 miles. And then, I crested a small knoll and saw a party! It was aid station 5, complete with humus and chips (you crave weird things in ultra races). Somehow I had covered the previous 5 miles much faster than I thought and the words "downhill just ahead and only 8 miles to the finish" renewed my strength. I even appeared to be on pace to break 5 hours, a threshold I never thought I could get to without tons of training. 

Smells from grill (unhelpfully) emanated onto the course with several miles to go

But the last 4 miles were where my minimal training took its toll. I walked a lot. I quickly fell off the sub-5 hour mark. I was passed by 5 or 6 people where I hadn't been passed in the previous 10 miles. But my 3-year daughter Eden's cry "DADDY!" in the ferns at mile 29.5 strengthened my resole to finish. She's bound to be a runner when she gets older and probably could have hung with me for the last stretch if I had let her. One more downhill; one more uphill; and one final flat section and I was done.

Coming down the home-stretch!

In the end it was a great race on a fantastic course. Yeah, there may have been ill moments or miles, but on balance the whole thing was a lot of fun. My college running buddy Dave Williams finished his first 50k. We had a great time staying with his family and seeing other friends in Blacksburg. The race had over 200 entrants, which made for a wonderful party at the finish. I always meet crazy people during these events and am thankful for the chance to be stretched to a limit I don't often get to. I think I'll return to my minimal training strategy for the next few weeks though.

Dave, finishing the race with his daughter Hayli

September 26, 2011

UBER Rock 50k Race Report, et cetera

Its been a long time since I've blogged. Even longer since I've run a 50k; which is what I did this past weekend. This is not to say that there haven't been any house projects to blog about since last October (there have been tons!) or that I haven't run any interesting races since my last 50k in August 2008 (I have!), but "running" thirty-one miles through the mountains provided me with ample time for introspection and prompted these reflections.

Still standing...!
Saturday morning started just before 5 AM, with a "shower" in Bodyglide. A friend showed me the stuff before the 2008 Death Valley Marathon and any run over 20 miles since then hasn't been pleasant without it. I ate half a Bodos bagel and poured two huge cups of coffee. My dad, who drove down from New York, and I jumped in his truck and were off. The race was being held at Wintergreen which is about an hour from where I live in Charlottesville.As we approached the Blue Ridge Mountains the fog started to descend on the mountains. The pre-dawn temperature was in the high 50s, fantastic for a long run. It had poured throughout Central Virginia the day before, which also helped cool things down. 

The big event on the day was the UROC 100k race. Some of the best runners from around the country were at Wintergreen to compete in what was being billed as the Superbowl of Ultraracing (one of the many reasons I stayed away from the 100k!). The elites were off at 7 AM; the rest of the field at 7:15. 

Something strange happened during the half-hour or so between the start of the 100k and 7.30. My dad, who hadn't run in some 6 weeks due to an injury, suddenly felt well enough to do the 1/2 Marathon. He had signed up in July but was "injured" in August. He took inventory of the clothes / gear he had brought up the mountain. If he wanted to run, he'd have to do it in a pair of hiking shorts and needed to borrow one sock and a running shirt from me. Other than that, and though he hadn't done a 10 mile run in over two months, he somehow figured he could run/walk his way through the whole thing.

While he was changing into my "backup" gear, I noticed that the race course had changed, A LOT. Apparently on Wednesday (three days before the race!) the directors decided to double up on some of the 100k course and avoid a grueling final 5-mile, 2500 foot climb. Luckily, I was fairly well acquainted with the revised section as it had been part of the the 1/2 Marathon course I'd run in the previous two years.

At 8 AM both the 50k and 1/2 Mar races took off. As part of a new strategy, I took off very slow. In the last 50k I ran, the Mount Disappointment 50k in Southern California, I started way too fast. By mile 10 I was exhausted and walked a good portion of the last 20 miles. This time would be different; I wouldn't get suckered into expending all my energy on the first climb. Admittedly however, I was a bit jealous of the general abandon with which the bearded-shirtless guy sprinted out of the gate.

In hindsight my strategy was probably off by 30 seconds, though I couldn't have known it at the time. Right after the first mile mark I was in roughly 20th place out of 200 or so runners. Accidentally (?), someone in those first 20 people set off a hornet's nest-booby trap that would entangle runners all the way back to my dad, who was running towards the end of the pack. Without warning, a swarm of hornets attacked me from the right side of the trail and I was swatting them off with two very ineffective, water-bottle holding hands. I felt stings everywhere and started hearing shrikes up the trail behind me. The stinging on my own body stopped after 100 years or so. And after another 1/4 mile I was mentally clear enough to take inventory: six stings, including the one that crawled up into my hat. My dad, about 150 runners back, got 5 stings. I hoped mine weren't enough to trigger an allergic reaction. The only other time I'd sustained multiple bee-stings was while mowing the lawn in high school. That adventure ended with me passing out in the ER. I didn't want a repeat. It would be 4 more miles to the first aid station (if I needed to drop), though it would definitely have sucked if I had trained all summer only to be taken out at mile-one by some pesky bees. 

Whether due to the multiple stings or the 1500 foot climb in the first few miles, by the time I reached Wintergreen summit, I was feeling pretty loopy. No hives, I just felt "off." I choked down a Cliff Shot and was thankful for some downhill. Most of the next section was made up of randomly strung together trails, roads, and connecting paths that wove their way between various vacation homes high up on the mountain. People gathered in small groups to watch the race--drinking coffee, wearing warm clothes, and not nursing hornet wounds. I was slightly jealous.

As the downhill continued and we came out onto Wintergreen Drive, I started to get into a groove. Hornets be damned, I was going to keep running. After a fairly steep uphill to Reeds Gap (where I finally caught up to a 3-month pregnant woman who had passed me on the downhill!), I buzzed through the second aid station at 9.8 miles feeling pretty good, especially after I dumped a dozen or so rocks out of my shoes. The pregnant woman went screaming by me again after briefly describing her desire to turn around and only do the 1/2 Marathon. Ultra runners are of a different breed...

The second 10-miles felt great. They were largely a rolling descent into Lake Sherando via the Blue Ridge Parkway and some nice single-track. I started catching people in the back of the 100k pack who had taken off 45 minutes earlier. I kept up the 10-minute per mile pace I wanted to hold through to the final climb. [For those uninitiated with mountain running, take your typical road pace and add 50% (at least!) to your time. In a long road race, my pace is generally around 7-minutes per mile; in the two 50k races I'd done previously, I hovered around 11-minutes per mile. Between rocky trails, steep mountains, and aggressive wildlife, the pace slows appreciably (at least, those are my excuses!)]. For this race, my hope was that in the three years since my last 50k, I had somehow learned how to pace myself rather than burn out early.

At 18 miles, I hit the second "lake" aid station and started what would be a long, rolling 9-mile ascent back up to Reeds Gap. My pace slowed but I still felt good. Around mile 20 I found the pregnant woman and bearded-shirtless guy down in a stream off the trail. Apparently her foot had swollen pretty badly and she had it sitting in the cold water. She had twisted it on a rock heading down and ran a few more miles before calling it quits. The bearded guy turned out to be her fiance. They both dropped. The race didn't really matter to him anyway; he was using it as training for the 100 Mile Grindstone in two weeks. Sheesh... Their child is going to be born with running shoes on...

By the time I got back onto the Parkway the mountains were completely socked in with fog. For the final 9 miles I didn't see another runner. It was somewhat lonely, but also relatively relaxing; as relaxing as a 9-mile run after you've already done 22 miles could be I suppose. I rolled through the aid station at mile 27 on pace and with only one mile of "running" left. The final 4 miles were 1 steep mile down, 3 steep miles up. My strategy was to run the downhill mile and powerwalk the final three. I'd been here before. The Mt Disappointment 50k ended with a brutal three-mile uphill. I only hoped that the Ibuprofen and salt tablets I'd choked down at mile 26 would help me not feel the searing pain in a portion of my lower-quads that I'd never known existed before I started "running" 50ks. Halfway up the hill I started running a bit. Strange... I actually felt good.

The final 1/2 mile or so was, generously, downhill. No one was cheering as I came in, in part because there are no crowds like there are at even the smallest marathon. And even if there was a crowd you could only see only a 100 feet or so anyway due to the fog. I think I only saw the timer when I finished. The one person who did see me within 10 seconds of finishing was my dad. He'd since changed into my spare hiking shorts after finishing his race. "Injured" though he was, he managed to win his age group in the 1/2 marathon! I hope I can hang like that when I'm in my late 50s! While writing this post, I received a text from him that said: "trouble walking BIG time today; feels good in a strange kind of way. hope you are ok."

Dad and I following the 50k.
Hobbling around this morning I feel similar to my dad: "trouble walking BIG time...but good in a strange kind of way.". For the first time ever, I had finished the 50k and felt good. I maybe even could have run a few more miles. I even had enough leg strength yesterday to stand on my feet for a few hours and paint some trim on the front porch. My 'go-out-slow' strategy seemed to work. I finished 12th out of 120 starters (apparently, 40 people dropped out, whether due to the bees or mountains or being pregnant, I don't know). And I took over 20 minutes off my 50k PR. Next up: the 50 miler in March? Maybe in 3 more years...

Rehydration strategy back at the house. Poured from a growler purchased at Devils Backbone.


October 29, 2010

Case Closed

Whew! Yesterday marked the end of a remarkable chapter in the life of our home. We finally closed the refinance of our construction loan. Normally this type of thing wouldn't result in a blog entry; I'm bad enough as it is with posts lately. But our refinance is a tale of deception, a local version of the banking crisis, and extremely good fortune (Providence?).

The front of the house nearly one year after we started work
Nearly one year ago, when we were still relatively on schedule with our renovations, I put down a deposit at Stellar One bank to refinance out of our construction loan (redflag #1 - most refis don't require deposits). Towards the middle of November 2009 it became clear our contractor wasn't going to finish on schedule due to a window placement issue. No big deal (to some degree); we canceled our refi and the bank said they were going to hold the deposit until we initiated the refi process again (redflag #2); who was I to argue. Admittedly, I wasn't super excited about this 'requirement' for them to keep our deposit, but at that point I had not reason to think things wouldn't work out down the road.

Fast forward 3 months. Towards the end of February, when the contractor finished the family room addition, I contacted Stellar One again to initiate the refinance. The original loan officer, who structured the construction loan and subsequent refinance was "no longer with the company" (we have heard through various channels: "fired"; redflag #3). A new loan officer had been assigned to the refi. And without going into all the bloody details over the subsequent six months we were strung with promise after promise to close the loan. Each time they didn't close it they refused to return our deposit because, so they said, they should be able to close it through some other loan process (redflag #4). By contract, we were required to refinance out of our construction loan one year after we started construction; i.e. by 9/1/10. However "new mortgage regulations", a lack of understanding of our file by subsequent loan officers (we had three new officers over 6 months), and, we later learned, some very incorrect dealings by the original loan officer resulted in us going nowhere by September.

The front of the house from another angle

Finally by mid-September I demanded (against the advice of my lawyer) that Stellar One return my original (and on their part bogus), several thousand dollar deposit so that I could pursue a refinance through another lender. Apparently the demand--directed to Stellar One's director of retail mortgage--was enough to cause them to finally return the deposit.

Throughout the course of the drama I nervously watched rates and prayed the local real estate market held firm long enough for our re-appraisal to stay high. If rates rose dramatically, especially as I expected after the end of the Fed's purchase of mortgage backed securities in March, we may not have been able to afford the new payments. If the local marked tanked, our appraisal may have came in with us showing less than 20% equity even though our original down payment and cash put into renovations put us well over that figure. Fortunately rates fell over those 6 months, netting us hundreds of dollars per month of interest savings. Had we refi'd back last fall, our rate would have been over a full point higher than where we are at today. And our final appraisal came in much higher than we expected, thanks to a slow but price-stable local market. Thus, the 'happy ending' yesterday at the lawyers office where Emili and I signed the paperwork for our permanent loan. Now if only we could get all the painting done...

Em and I out front of the homestead after trashing her wedding 
dress. More fun photos at: http://tinyurl.com/2010trashdress

June 08, 2010

Watch out for that Tree!

A few weeks ago during a bad windstorm, the Norwegian Maple in our front yard decided to let go of some branches. The results are below.




Ironically just a few weeks before this "free" cord of wood appeared in our yard, we had an arborist perform a survey of the trees on our property. The maple in question has given us concern due to its multiple dead and dying branches. And as expected, the arborist said that tree was past its typical lifespan of 50 years. He said we would continue to find dead limbs until in our yard and that in a few years (5-10?), it would have to be completely removed.

Interestingly, he also said that we shouldn't have any catastrophic branch failures and that he didn't see a problem with us parking beneath the tree. Well! Lucky for us, I had not yet used all of our mulch (see the first photo) and the remaining pile served to prop one of the branches up so as only to impose a minor dent on the hood of our car.

When another major storm blew in this past weekend (more on that later), I expected the entire tree to come down. Instead, just a few "minor" branches fell, even though damage within the 1/2 mile surrounding our house was extensive. My dad, who was here over the weekend, left me his pole saw so that I could remove more of the weaker limbs closer in to our house.

The entire episode has left us wondering what tree to replace the maple with. We love the privacy and shade it provides and would be loathe to cut it down until we have some replacement started. Currently we're considering one of the newer American Elm cultivars, known for both rapid growth and resistance to Dutch Elm Disease. Our plan (and hopefully our maple will go along with it), is to allow the Elm to grow up over a few years while we slowly take the maple down. Oh, and we're not planning to park under the tree any more either!

April 30, 2010

Progress: Mar & Apr 2010

New modernist structure in the front yard or something else?


The last two months has seen some good progress at the house, notwithstanding the lack of posts to this blog. Much of late February / early March was spent cleaning up all the construction debris strewn around the yard as it appeared from under the freakish 70" of snow that covered the ground this winter. I'm still awaiting a bill for the haul away (which will tell me the tonnage we discarded), however I filled most of a 21 cubic yard container with demo material from our side room, cottage, and siding. It pained me to create so much rubbish; but we donated as many good doors, sinks, and windows as we could to the Habitat Store.


The other big area of improvement for April has been the front porch. Easter weekend, when the concrete slab in the side room wasn't quite ready to be painted, we decided to paint the brick at the front of the house. We had always intended to paint the brick, Emili just bumped it up on the list when we couldn't paint the side room (due to drying time of the concrete). Within a few hours, the house looked transformed (again); from two colors and two materials to a single color. Now we just have to paint the brick on the other three sides!

Newly painted brick at the front of the house.

The other major undertaking at the front porch area was painting the porch itself. The contractors finished the front porch area just before we received our first 24" storm of the season in December. After the storm, it didn't get out of 30 degrees for two months making painting impossible. When the weather finally warmed, some of the floor boards, especially at the perimeter of the porch, had "cupped" a bit. As part of the final punchlist (which was finished last week!), the contractor belt-sanded the front before we painted it.

View of the sanded deck, prior to painting, 
from within the enclosed porch.

Another view of the porch with plastic around it, 
intended to keep the pollen off it while we painted. 

Once the sanding was done, we stapled plastic around the outside in order to keep pollen and leaves off the porch while we added 3 coats of paint. It was pretty fun to work inside of the plastic and we definitely saw a few people drive by slower than normal as if to ponder what the heck we were doing. This weekend brings good weather and goals of mulch, gardening, and possibly finishing the floor in the family room.

Finished floor on the porch.

Mulch pile. Hopefully I'll make some headway this weekend!

February 26, 2010

From the Archives: Ode to Los Angeles

A year ago last week Emili and I ended our seven year sojourn in Los Angeles and moved back to our historical roots on the East Coast. As I sat in a coffee shop in West LA last February, between beating rush-hour traffic out of downtown and waiting to arrive at my last construction site visit, I wrote the following in my journal:
The last three months have been incredibly hectic. Since taking the Structural Engineering Exam in late October I finally decided to return one last time to academia, selected a school, found a new job, gave notice at another. Today is my last day at that job--Structural Focus. As this day has approached I've often wondered whether we are making the right move. I love my job, my co-workers, Los Angeles... Right now Charlottesville feels very provincial by comparison.
In many ways I've learned most of my engineering skills--career related ones anyway--while at Structural Focus. I'm extremely thankful to have worked there these last 2-1/2 years. I'll truly miss the friendships I've formed with my coworkers. And I'll probably never find a work environment with the same mix of professionalism and freedom--relaxed professionalism--ever again. 
Beyond leaving my current job, moving out of Los Angeles is the end of an era. Shortly after getting married Emili and I moved to a city that was 2500 miles from our closest family members. We moved with many friends to a city that none of us knew. In our seven years here many of our friends have moved on, moved up, moved away, left the bonds of fellowship. Now is our time to move.
Last week while driving to Big Bear to go snowboarding with my coworkers we drove by the hotel where Emili and I spent our second anniversary, past two different campsites where we spent weekends with friends from kairos, past scores of burned acres from our first close up encounter with wildfires in 2003.

 I definitely miss having a mountain like Big Bear so close to home.
Emili and I had dinner recently with Amy Murphy and Michael Maltzan, a fantastic couple who have shaped our story  in so many ways... We also shared a few hours with Gary and Pam Hilliard, who took the daring step into homeownership in Southern California with us and who re-taught me the joy of trail running... We had a meal wtih Ben and Lauren Thompson--a couple we have grown up with individually and together for 12 years. And tomorrow we'll share our final meal on the West Coast with Kevin, Annie and their son Luke for his 2nd birthday. Our sons will say goodbye and probably never remember this best friendship they had for two years. 
 Photo from an annual Kings Canyon trek. This is at the 'summit' of Glen
Pass, 2008. Relatively close to Los Angeles, a bit further from Virginia.
So many times I've second guessed. Not completely, but deeply second guessed whether moving "home" is what will make us happy. Obviously no place will completely make us happy; our choice to move East is what we want for our family. We have wonderful friends who have already gone East before us and are hoping to reconnect with them. But its impossible to live somewhere this long and not put down roots. I assume we're going to feel uprooted and unstable for months to come...[] For now reality calls me back to my last site visit on this my last day of work--to look at the nearly completed construction of a house I started designing my first month at Structural Focus.
We've been in Virginia a year now. Roots are starting to grow. This second year will hopefully see the inauguration of annual traditions. And while Los Angeles and California now feel worlds away, on occasion there is a strong call to return and "Go West...", again.

February 22, 2010

Progress: Jan & Feb 2010

For much of January and early February we attempted to put our kitchen back together. After removing the wall separating the kitchen and dining rooms (see this post for original kitchen / dining photos), we wired several new lights (the white pendants you see below), patched the floor, re-plumbed the sink and stove gas line, fixed a plumbing vent line, and plastered all the gaping holes back up. The other major effort was replacing the peeling countertops and re-orienting the fridge and adjacent cabinets to the side wall. 


 

  

  

  

We still have a lot of "finish" work to do in the kitchen. We plan on replacing the track and chandelier lights, painting the cabinets and walls, and possibly white-washing the floors. This work will be done over the next few months, once we have finished the cottage and exterior painting. 

The winter weather broke enough this weekend (we've now reached the all time record for snow; good year to do construction!) and allowed us to get some painting done, namely the front porch ceiling and primer on the back family room. In the photos of the family room you'll see that the contractors were able to add the new transoms between our most recent 10" and 18" snowstorms. 


 
Using sky blue paint for the porch ceiling helps prevent 
wasps and the like from building nests, or so we're told.



  

  

 

This week we're hoping to paint the walls and get a finish coat of sealer on the concrete floor in the family room so we can begin using it (3 months late!). Though we still have a bit to do things are starting feel more finished.

January 08, 2010

a lesson in patience

Its probably too early to fully detail what our home renovations have taught us. However with the almost daily anxiety we're experiencing trying to finish everything up, we've learned many things already, as they say, "the hard way".

Luckily the new porch rafters were sized for snow loading! Three days after "substantial completion," Charlottesville enjoyed the largest single-drop snowfall in 40+ years. We ended up with 24" pushing down on the new rafters.


The major lesson looming in my mind recently has been how quickly we took on the renovations, how un-patient we were to get going. Conventional wisdom says to live in a house for a year (or more) before deciding what to do with it. For us, after two 30 minute walkthroughs--one open house and one deciding what needed to be renovated--we defined most of our current scope of work (a front porch, back family room, cottage renovations, central heat and AC, and new exterior siding) and plowed forward with the loan process. I mean, between the two of us we're an interior designer and a structural engineer. We can remove walls and re-arrange the guts of the house. Why wait?

The terms of the renovation loan we were offered also made doing the work up front rather than waiting very appealing. Added to the attractive loan terms was the need to have the design approved by the appraiser / underwriters before closing on our loan. And with future plans for me to begin working on another degree in the fall of 2010, we decided now was the time to go for it.

This decision led to a hastily assembled set of plans and a relatively loose scope of work, particularly with the details. One benefit of not detailing everything out was that it allowed us to make game day decisions on many smaller issues--how the soffit would look, where exactly the porch columns should be located, etc. And lots of details needed to be decided during construction rather than beforehand because we didn't have access to the house while developing the final plans (the previous owner didn't want us frequenting the property during escrow to take measurements, decide on massing, ...). The downside to the quick design period has led to several change orders, lots of miscommunication with the contractor, and even questions like: "What do we really need this family room for anyway?" shortly after the foundations were excavated.

The back-yard facing family room is on the left. It is still unpainted due to the cold weather.

Many times over the last few months we have wished we'd lived in the house longer before plunging in; wished we made different decisions during construction; wished we had the help of another two dozen sets of eyes (maybe even an architect!). We've wondered what we could have done with money we spent on portions of the project we had already finished--especially with the family room. "You know, for the price of that room we could have traded our scratched floors for newly sanded ones, purchased replacement windows that don't leak volumes of cold air, and an expanded our kitchen design from the relatively simple one we're pursuing." And after living in the house three months all of these details--new floors and windows and a better kitchen--became "priorities" that the two 30 minute walkthroughs didn't reveal. On the flip side, we're fairly certain that we would not have worked out the massing of the front porch or the roof tie-in over the entry room unless we had the family room addition at the back. And this, from an exterior perspective changed the entire feel of the house in a way that we are very, very happy with.

In short the renovations are a mixed-bag of victories and losses. At present we're certainly happy with more of the decisions than we're disappointed with. But we'd have hoped that with all the money we've paid out and inconvenience we've lived with for 4 months, that everything about the design would fall under the positive category. I should know by now that no project is ever 100% what the owner wants. Still...

We've found it extremely difficult to be patient with our house. We want everything done up front so we can enjoy not renovating it once we're done (with our house in California we did many projects right before selling and we regretted not being able to enjoy them longer). Just this week we made another impatient decision: we rushed in an bought a sink online without checking local dealers. We saved money on the sink but not on shipping and we ended up ordering the wrong sink anyway (due in large part to a misleading photo on the web page). Now we can't return it. After calling around we learned we could have bought the same sink locally for less than the cost of the online sink plus shipping (and we wouldn't have had to deal with the extremely unhelpful "customer service" people at efaucets.com). I suppose soon enough we'll be finished with construction and can practice patience watching our bank account recover from the past 6 months!

So would more time up front have led to fewer regrets? Probably. Would it have eliminated all problems? Surely no. Were we able to do it over again I would have tried to pass a preliminary design by the appraiser and then modify it after 3 months of living there--before bringing in the earth moving equipment. Though on that that schedule the excavators would have been breaking ground right when the 24" of snow dropped. Unfortunately renovating a home is so infrequent an occurrance that it is difficult to learn and apply the lessons from one project to the next. This is where conventional wisdom could have helped us. If only we had listened better.

December 31, 2009

Week 13-14 (Dec 21 through Dec 28)

When we started designing the renovations back in June we decided we would spruce up the kitchen by painting the cabinets. We liked what we saw in our two walkthroughs (as well as the photos we looked at again and again during escrow) and therefore set aside only a minimal amount of money for kitchen improvements. Our final renovation decisions included a new Family Room, Front Porch, Air Conditioning, Siding, and improvements to a detached "cottage". Below is the floor plan showing the porch and sunroom additions as well as a key plan of the kitchen showing original photos.





Photo 1: Back of the kitchen

 
Photo 2: Side of the kitchen

 
Photo 3: Kitchen wall adjoining dining room




Photo 4: Dining room wall adjoining kitchen



After a few months of living at the house we found that we rarely used our dining room. We set a small table in the kitchen and ate almost all of a our meals in there. With two small children almost half of our dinner time is spent getting up and down for things we forgot and cleaning up spills! The exception to the kitchen "nook" dining has been two birthday parties we hosted because we needed more space.This became comical when we ate Thanksgiving dinner in the dining room and our three-year old son requested that we sing happy birthday because all former meals there were birthdays. We'd thus come to realize that our kitchen and dining rooms were too detached--both from one another and from the rest of the house--and that some modification was needed.

Unfortunately this realization came after we had burned through most of our contingency and reserve funds, so modifications had to be relatively inexpensive. We couldn't do new cabinets but the countertops cried out to be replaced; the laminate had de-laminated in several spots and was cracked and severely stained in others. Our "ultimate" kitchen design would have included taking over the small bathroom adjacent to the kitchen and making it a breakfast nook. In addition the wall between the kitchen and dining rooms would be removed.


We explored this option for several weeks. Around the same time however, a construction mishap (for lack of a better term) at the sunroom sapped most of our remaining reserve fund. Thus, our kitchen re-do would have to be shoestring. We opted to remove only the non-bearing wall between the kitchen and dining rooms and add an island coutnertop between them. The fridge and adjacent cabinets would be moved to the interior wall and we would paint the cabinets (as originally planned) to freshen them up.

The photos below show only a few days of work in this area, basically the removal of the wall. The impact already is amazing! We anticipate a couple more weeks to get things functional again, though it will likely be a month or more until we have things buttoned back up. Until then, we're eating breakfast in our hallway and dinner at my inlaws.


Photo in the same direction as "4" above.

 
Photo in the same direction as "3" above.

December 30, 2009

Weeks 10-12 (11/30 through 12/14)

These few weeks saw the substantial completion of the contractor's work, including--with much excitement on my part--the siding. Since Week 2 way back in October we have had Tyvek or plastic on substantial portions of our 2nd floor. I've been somewhat skeptical regarding the purported water-proofness of the Tyvek system (and less so of the plastic sheeting), especially after the entry room ceiling showed signs of leaking (after the new roof was added. The entry room is the one story portion on the right of the house; see below).


Siding completed on the front | Tyvek still on the side

Apparently water was getting in behind the roof flashing because the flashing was installed over the Tyvek. The new siding, installed on top of the flashing, has corrected the issue. Anyway, waterproofness caused only part of my anxiety over the last several months. Our house sits on top of a ridge. Being as such, we have pretty decent winds on a regular basis. And when wind gets behind Tyvek, especially if its not nailed super well, it produces an incredibly loud whipping sound. It's loud enough to have caused many sleep-deprived nights for Emili and I as well as our children (which in turn, makes for more sleepless nights for us!)


Siding mostly complete on the back | We still need to paint the addition siding!


Needless to say, we are incredibly happy to have the siding complete. Everyone is sleeping better. There appears to be no more leaking. And the visual impact of the new siding is striking (the old siding was a cracking and mold-stained wavy asbestos).


"Finished" front elevation with a (relatively) clean front yard



At this point the contractor has only very minor things to complete, including, as I'll detail in a later post, a fairly substantial construction mishap. Other than that, we're still awaiting the concrete floor in the entry room as well as a carpet / vinyl in the rental. We also have lots of painting to do and the weather in Charlottesville has been less than cooperative lately. Finally, last week we also decided to demo one interior wall in the house--the one between our kitchen and dining rooms. The initial impact has been amazing (more in a later post). Its currently causing a bit of a challenge in terms of eating at our house, but in the long run will be totally worth it.

December 21, 2009

Week 9 (11/23/09)


Being that this was Thanksgiving the contractor had a short week and worked mostly on punchlist items (cleanup type stuff related to the original scope of work). My parents came into town for the holiday and as soon as my dad arrived I put a paintbrush in his hand!




The four days off provided spectacular albiet chilly weather and my dad and I endured the difficult task of painting every nook and cranny between the exposed rafter tails. I love the look of open rafters but partway through painting them wondered about the sanity of their detailing. My neighbor had warned me they would be a painting nightmare and all told we spent a combined 20+ "holiday" hours on them. We did sneak in a few good runs (6 and 10 miles) and were able to catch the entire VT / UVA football game. So all in all it was a great few days.



As I'm writing this post a few weeks late, I can't believe how fortunate we actually were. Since Thanksgiving, Virginia has rarely had two consecutive days above 50 degrees; I've tried to paint the rest of the exterior as well as the porch columns, to no avail. The cold weather culminated in 24" of snow this past weekend! This change in the weather took a bit of adjusting for me...after living 7 years in Southern California I'd become accustomed to having 70 degrees and sun after a day or two of rain. I forgot that when winter comes on the East Coast, it usually doesn't leave for months. So to have a few extra able bodies around the house both to help paint as well as watch the kids (thanks mom!) was priceless. All of the "critical" painting got done and the exposed wood was sealed for the winter.

November 25, 2009

Week 8 (11/16/09)

As we're closing in on the original completion deadline (Nov 30) I'm realizing that we're not going to finish on schedule. To those who have done renovations on old houses this will come as no surprise! Even the general contractor who has stayed relatively close to his schedule will not hit the target date. The schedule has caused me a lot of headache over the past few weeks due to our loan committment deadline. However this week I was able to negotiate out of it (which is doubly good as rates have come down even more) and will re-lock our permanent loan after Thanksgiving. This means our construction loan will close early next year.

Loan locks and deadlines notwithstanding work moved steadily along this past week. The contractor shingled the entire roof, installed skylights in the sunroom, finished interior trim, and finished the porch floor. On our end we cleaned the cottage in order to finish and wax the floor--we decided to have a finished concrete floor rather than the less durable laminate floor option--and we also began painting the .